Banchory Wastewater Treatment Works

Colloide collaborated with ESD Water on a significant project in Banchory, which involved constructing a Humus tank with a full bridge scraper.

The project aimed to enhance the functionality of a 9000mm diameter tank by replacing cable glands and conducting on-site dry commissioning. The main goal was to optimise wastewater treatment processes, improving the collection and removal of settled sludge and scum from the tank.

This case study showcases how Colloide contributed to streamlining the wastewater treatment process.