Banchory Wastewater Treatment Works

Colloide collaborated with ESD and Scottish Water on a significant Wastewater Treatment project in Banchory, which involved constructing a Humus tank full fixed bridge scraper.

The project aimed to enhance the functionality of a 9000mm diameter tank. The works also included the replacing of cable glands and conducting on-site dry commissioning. The main goal was to optimise wastewater treatment processes, improving the collection and removal of settled sludge and scum from the tank.

This case study showcases how Colloide contributed to streamlining the wastewater treatment process.