District Heating Projects Transforming Tyne and Wear

Revolutionising Energy in Tyne and Wear

District heating projects are rapidly becoming integral to sustainable development in Tyne and Wear, offering innovative solutions for reducing carbon emissions and improving energy efficiency. These projects are not only enhancing the local environment but also setting a benchmark for other regions to follow. Colloide is proud to contribute to these transformative initiatives, leveraging its expertise in energy and environmental engineering to support sustainable urban development.

Icon for The Importance of District Heating

The Importance of District Heating

District heating involves the distribution of heat generated in a centralised location to residential and commercial buildings through a network of insulated pipes. This method of heating is highly efficient and sustainable, offering numerous benefits to communities.

Energy Efficiency

District heating systems often utilise combined heat and power (CHP) plants, which can achieve efficiencies of up to 80-90%, significantly higher than conventional methods of generating electricity and heat separately. This leads to reduced energy waste and lower overall consumption.

Reduction in Carbon Emissions

By utilising renewable energy sources and capturing waste heat from industrial processes, district heating systems can reduce greenhouse gas emissions by as much as 30-50% compared to traditional heating methods.

Cost Savings

Centralised heating plants benefit from economies of scale, producing heat at a lower cost than individual boilers in each building. This results in lower energy bills for residents and businesses, while also lowering maintenance costs .

Reliability and Maintenance

District heating networks are managed and maintained by specialised companies, ensuring consistent and reliable heating services. This approach also alleviates the maintenance burden from individual property owners.

Community Benefits

District heating projects often stimulate local job creation and investment, fostering economic growth and social development within the community.

Showcase of Key District Heating Projects in the North East

Featured Image for District Heating Projects Transforming Tyne and Wear

Newcastle Helix

One of the standout projects in Newcastle is the District Energy Centre at Newcastle Helix. This state-of-the-art facility uses CHP technology to provide efficient and sustainable energy to the entire site. By utilising low-carbon energy sources, the District Energy Centre significantly reduces the carbon footprint of Newcastle Helix, demonstrating a strong commitment to environmental stewardship and innovation . Engie has played a key role in managing and operating this energy centre, showcasing its expertise in sustainable energy solutions.

Project Overview:
  •  The Energy Centre covers: 732 sqm.
  • Providing 10MW of heating
  • 5MW of cooling
  • 8MVA of power to the connected buildings on the site
  • via 5.2km of buried network
Learn more
Featured Image for District Heating Projects Transforming Tyne and Wear

Byker District Heating System

The Byker District Heating System, originally installed in the 1970s, provides heating and hot water to homes and buildings on the Byker estate. Since 2012, significant upgrades have been made to improve efficiency, reliability, and sustainability.

Project Overview:
  • Includes 1 MW biomass and CHP boilers.
  • Replaced 5.6 km of pipes and 13 heat transfer stations.
  • Improved reliability and no heat charge increases since 2012.
  • Installing modern heating controls and equipment in homes.
  • Considering additional biomass or CHP boiler installation.
Learn more

South Tyneside’s Renewable Energy Initiatives

South Tyneside is leading in renewable energy with innovative projects like the Viking Energy Network, Hebburn Renewable Energy Scheme, and WHREN, showcasing a strong commitment to sustainability and advanced green technologies.

Featured Image for District Heating Projects Transforming Tyne and Wear

West Holborn Renewable Energy Network (WHREN)

The West Holborn Renewable Energy Network (WHREN) is South Tyneside Council’s most ambitious energy project, aiming to harness renewable energy from abandoned flooded mines and the River Tyne to power local buildings.

Project Overview:
  • Uses heat from flooded mines and the River Tyne.
  • Powers Council and public sector buildings in South Shields.
  • Estimated at over £20 million, with external funding sought.
  • Cuts 2,436 tonnes of carbon annually.
  • Saves over £800,000 yearly.
Learn more
Featured Image for District Heating Projects Transforming Tyne and Wear

Viking Energy Network Jarrow

The Viking Energy Network in Jarrow is the first of its kind in the UK. On this project, Colloide acted as Principal Contractor for South Tyneside Council. This innovative network harnesses low-grade heat from the River Tyne.

Project Overview:
  • Combines river source heat pumps, CHP, solar farm, and battery storage.
  • Powers council buildings, including a leisure centre and town hall.
  • Reduces emissions by 1,035 tonnes annually.
  • Supported by a £4.6m ERDF grant.
  • Potential to connect more buildings, including schools and hospitals.
Learn more
Featured Image for District Heating Projects Transforming Tyne and Wear

Hebburn’s Renewable Energy Centre

The Paul Younger Centre in Hebburn is a new Renewable Energy Centre designed to provide sustainable heating to local buildings and residents, contributing to South Tyneside’s carbon neutrality goals. Vital Energi and Driver Group were instrumental on the build of this scheme.

Project Overview:
  • Utilises air source heat pumps after initial plans for mine water pumps were revised.
  • Heats Hebburn Central and Durham Court, with future expansion possible.
  • Reduces emissions by 319 tonnes annually.
  • Total project cost is £7.7 million, with 50% funded by ERDF.
  • Supports carbon neutrality by 2030.
Learn more

Heat Networks in the North East and Tees Valley

The North East and Tees Valley regions are fertile grounds for investment in heat networks. These areas present substantial opportunities for the development of large-scale district heating systems, which can deliver significant environmental and economic benefits. By investing in these networks, stakeholders can help build a more sustainable and resilient energy infrastructure. The district heating projects in these areas are paving the way for a more sustainable and energy-efficient future. By embracing innovative technologies and renewable energy sources, these initiatives are setting a powerful example for other counties and cities to follow.

 

Colloide’s Commitment to Sustainable Energy

Colloide is deeply committed to supporting district heating projects and other renewable energy initiatives. Our expertise in water treatment, energy, and environmental solutions positions us as a valuable partner in the journey towards sustainability. We are proud to contribute to the collective effort to create a greener future within this areas and beyond. We are committed to engineer a brighter tomorrow for people and the planet.

 

 

** All sources referenced in this blog are properly linked within the content. Images used are derived from these sources and are believed to be within the public domain or used under fair use principles. If you believe any material used in this blog infringes on your copyright, please contact us, and we will address the issue promptly. If you would like to be mentioned within this content please contact [email protected]

Get in touch today!

If you’re interested in creating a brighter tomorrow, we want to work with you.